References in zbMATH (referenced in 57 articles , 1 standard article )

Showing results 1 to 20 of 57.
Sorted by year (citations)

1 2 3 next

  1. Martin-Iradi, Bernardo; Ropke, Stefan: A column-generation-based matheuristic for periodic and symmetric train timetabling with integrated passenger routing (2022)
  2. Borndörfer, Ralf; Hoppmann, Heide; Karbstein, Marika; Lindner, Niels: Separation of cycle inequalities in periodic timetabling (2020)
  3. Daudet, Laurent; Meunier, Frédéric: Minimizing the waiting time for a one-way shuttle service (2020)
  4. D’Emidio, Mattia; Di Stefano, Gabriele; Navarra, Alfredo: Bamboo garden trimming problem: priority schedulings (2019)
  5. Wang, Pengling; Goverde, Rob M. P.: Multi-train trajectory optimization for energy-efficient timetabling (2019)
  6. Liebchen, Christian: On the benefit of preprocessing and heuristics for periodic timetabling (2018)
  7. Gąsieniec, Leszek; Klasing, Ralf; Levcopoulos, Christos; Lingas, Andrzej; Min, Jie; Radzik, Tomasz: Bamboo garden trimming problem (perpetual maintenance of machines with different attendance urgency factors) (2017)
  8. Canca, David; Barrena, Eva; Laporte, Gilbert; Ortega, Francisco A.: A short-turning policy for the management of demand disruptions in rapid transit systems (2016)
  9. Gattermann, Philine; Großmann, Peter; Nachtigall, Karl; Schöbel, Anita: Integrating passengers’ routes in periodic timetabling: a SAT approach (2016)
  10. Pätzold, Julius; Schöbel, Anita: A matching approach for periodic timetabling (2016)
  11. Pira, Clément; Artigues, Christian: Line search method for solving a non-preemptive strictly periodic scheduling problem (2016)
  12. Schmidt, Marie; Schöbel, Anita: Timetabling with passenger routing (2015)
  13. Zhou, Wenliang; Tian, Junli; Qin, Jin; Deng, Lianbo; Wei, TangJian: Optimization of multiperiod mixed train schedule on high-speed railway (2015)
  14. Barrena, Eva; Canca, David; Coelho, Leandro C.; Laporte, Gilbert: Exact formulations and algorithm for the train timetabling problem with dynamic demand (2014)
  15. Goerigk, Marc; Schöbel, Anita: Recovery-to-optimality: a new two-stage approach to robustness with an application to aperiodic timetabling (2014)
  16. Louwerse, Ilse; Huisman, Dennis: Adjusting a railway timetable in case of partial or complete blockades (2014)
  17. Visentini, Monize Sâmara; Borenstein, Denis; Li, Jing-Quan; Mirchandani, Pitu B.: Review of real-time vehicle schedule recovery methods in transportation services (2014)
  18. Siebert, Michael; Goerigk, Marc: An experimental comparison of periodic timetabling models (2013)
  19. Cacchiani, Valentina; Toth, Paolo: Nominal and robust train timetabling problems (2012)
  20. Cadarso, Luis; Marín, Ángel: Integration of timetable planning and rolling stock in rapid transit networks (2012)

1 2 3 next